Glossary
Retest Date
The date after which a batch of an ingredient must be re-analysed to confirm it still meets its specification before further use. Not identical to an expiry date — a material may remain within specification after the retest date, but this must be confirmed by fresh analysis rather than assumed. Retest dates on received ingredients should be logged and factored into inventory rotation and production scheduling.
